5.15.2010
Port side transition
The transition between the forward hull deck to the front of the bridge deck is a bit tricky. In the plans, Ian leaves it up to the builder to work out a nice shape. From this angle, it's difficult to get a feel for the lines and adding to the confusion is the fact that I needed to add a few wedges of foam to ease the transition the way I wanted. Future photo's should make a better impression. The array of tools from left to right are: hand auto body work sander with 36 grit, nice lithium ion cordless screw gun, spring clamps, Moisture cure polyurethane glue, spray mister full of water, heat gun for adjusting the shape and fitting of foam.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment