The installation of Harken CB mast track required the drilling and tapping of 160 holes in the tailing edge of the mast. With the help of a pneumatic drill and a couple of brand new taps, this went faster than I expected.
lower section of the mast near where the boom attaches
base of mast
tapping tools
looking down from the top of the mast.
0 comments:
Post a Comment