4.16.2014

Mast track install

The installation of Harken CB mast track required the drilling and tapping of 160 holes in the tailing edge of the mast.   With the help of a pneumatic drill and a couple of brand new taps, this went faster than I expected.

lower section of the mast near where the boom attaches

base of mast

tapping tools

looking down from the top of the mast.