6.05.2012

final long board session.

finished long board shaping of v groove micro / epoxy of starboard inner hull. This was an 8 hr grueling effort that not only required applying upward pressure, it involved full body twisting action to insure that the surface remained fair.

As seen, dust protection was beyond mandatory, it was down right life saving.  At the time, I was listening to an interview on public radio.  Perhaps you can guess who was being interviewed by the distinctive voice.  hint:  comedian.