3.26.2007

two down.......

Two down...two to go......

The starboard inner hull half is now resting on the shop floor in a stable position. I managed this in about an hour by myself using a couple of chain lifts, some straps and a little bit of head scratching.

Posted by Picasa

5 comments:

Anonymous said...

amazing!!!

Lance said...

I see Ian Farrier has your link on his site. Should add traffic. Looks like you are making great progress, hope mine goes as fast. I am still working on getting a building at a reasonable cost to do the construction in.

Anonymous said...

Why are you glueing the foam together. Have you seen the FRAM sailing site?

Geoffrey said...

I am interested in why you selected this design. I am selling my trimaran (see yacht world for 60 plus in washington I have offer so hopefully will be gone soon)and am looking for a smaller build project. I am thinking about the 44SC cat or the F-39 tri.

Anonymous said...

Are you going to assemble them before you proceed with the other hull? I don't know I'd leave them long term with just one side laminated