10.01.2007

baggin the starboard side aft bulkhead

So here's a method of vacuume bagging bulkheads: I stretched a rubber sheet of "pond liner" over my 12ft. x 8 ft. surface so that I only need to apply a membrane over the top of my layups. the first step is to apply the mastic. Do not remove the paper tape just yet.

Posted by Picasa

0 comments: