9.21.2008

installing a high density core section


The portion of the deck in front of the cabin gets a very high density insert. Here you can see an 8" x 16 in. end grain oak core that will transfer the compressive loads of the mast into the deck, the mast bulkhead and the forward center section bulkhead. Your looking at the under side of the forward portion of the cabin top.

0 comments: