Here's inspector Tang perched on the center bridge deck stringer. I've bonded 10 guide tubes along the underside of the bridge deck floor so that I can eventually run lines under the cabin and back up into the cockpit. I marked the locations of my tubes so that I will know where to cut into the floor section from above and mount the 90 deg. pulley blocks that will direct the lines into and out of the tubes.
7.21.2009
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment