The aft bulkhead now includes a couple of storage spaces. I may eventually install hatch covers here but for now, I think I'll keep them open so I'll have a place to put things that may need to be handy at a moments notice........like maybe a large sawed off mossburg 500 pump action shotgun to discourage modern day pirates......or maybe packs of Marlboro cigarettes to make friends with them......or maybe a copy of "Bennet Carls vest pocket book of jokes for all occasions" to ease any possible conflicts.
10.19.2009
cockpit storage
10.17.2009
forward bulkhead
10.13.2009
rounding off the corners
In this instance, I've used polyurethane glue, a few small sheet rock screws and a bit of packing tape to hold the wedges in position while the glue cures. The corners will then be sanded smooth prior to glassing the decks.
stern view
bonding the bridgedeck "transom"
pre molded flanges
i will bond the bridge deck "transom" panel. Next step will be to scribe the panel, cut and fit it, swipe a mixture of epoxy thickened with cabosil all over the flanges then bond the piece in place.
10.12.2009
closing in the "I" beam
The Aft Bulkhead
10.05.2009
A view from the port side hull
uni directional glass for hull to cockpit join
Aft bulkhead to port side hull join
9.19.2009
joining the bridgedeck
Once in place, scribed, trimmed and fitted, I used 1/4 in. lag bolts and squares of 3/4 in plywood to insure a good smooth join line. After that, I ran strips of duct tape between the blocks then from the top, I filled the gaps with a mixture of epoxy and cabosil. ( the tape keeps the goo in place) After this cures, I can unbolt my blocks and fill the areas under the plywood squares in the same way.
ladders, boards, straps and chain hoists
9.17.2009
4 parts in one
vac bagging again....
bow beam in place
inspecting the fore stay
Here I am inspecting the fore stay attachment thimbles that support a stainless steel bar all wrapped in place with unidirectional carbon.
9.11.2009
2 inch strips...
adjustable spreader
Bonded in place
figuring out how it all goes together....
forstay components
did a masterful job. It nice to have friends with a CNC water jet, mill and lathe.
9.07.2009
9.06.2009
bow beam end
Not so pretty..... but here's a bunch of duct tape being used to pull peel ply snug against the end of the bow beam. the bow beam ends are closed off by bonding the 3/16 in glass gussets in place by covering over with two layers of tri axial glass and epoxy. Peel ply helps to create a nice neat finish that does not require additional sanding effort.
bow pole hole
bow beam gussets
bow beam
As Ian Farrier suggests, it's best not to skip around the plans book. In my case, just when I'd rather be inserting the bow beams into the bows and getting on with bonding this boat together, I realized I needed to completely finish my bow beam ( including the carbon seagull striker )
Seen here is my shop monkey reminding me to follow the plans as I should.
7.21.2009
fitting the center bridge deck stringer
center bridge deck stringer
Here's inspector Tang perched on the center bridge deck stringer. I've bonded 10 guide tubes along the underside of the bridge deck floor so that I can eventually run lines under the cabin and back up into the cockpit. I marked the locations of my tubes so that I will know where to cut into the floor section from above and mount the 90 deg. pulley blocks that will direct the lines into and out of the tubes.
7.16.2009
Center Bridge deck stringer
shaping the bridge deck stringers
The under side of the center bridge deck floor gets some really strong fore and aft support stringers. Your looking at what will become the under side of the cabin bridge deck floor section. That chunk of foam will become the core of one of three stringers that support this section. The center stringer will incorporate line guides that will allow halyards to be led back into the cock pit.
7.14.2009
the basics
After a couple of years of laying glass, I've settled in on a very effective method of performing a surface lamination over core cell foam. Here are the simple steps that I use:
1. build mold
2. fasten foam to mold
3. skim coat the surface of the foam w0 micro and epoxy
4. let cure to the touch and rough sand any slight imperfections
5. roll out a good wet coat of epoxy using 3/8 Knapp half roller
6. roll out glass
7. roll top coat of epoxy and let soak down into the epoxy that is soaking upwards
9. roll on the peel ply
10. use bondo spreaders to smooth out excess resin in the direction of lamination.......do 3 to 4 ft sections at a time moving in one continuous direction.
works for me........
Bridgedeck floor
5.20.2009
Aft bridge deck
5.13.2009
1500 Watts of power
plastic pup tent
about to close the bag on the aft bridge deck floor
A sample vac bag layup

Here's an example of my vacuum bag process. I'm using my 8ft. by 12ft. rubber sheathed vac platform to create the flat aft portion of the bridge deck. This particular section has an angled portion that transitions into the floor of the interior bridge deck so I've used a filler block to create a solid lower surface to vac bag against.



