Installed the  two 32in. uni directional strips, layed the 16 in. wide triaxial girth strip, bedded corecell foam bulkhead strips along bulkhead join line,  gooped the whole mess with epoxy/micro/aero putty and installed the cabin bulkhead then double taped it in place and covered everything in peel ply.......all after work and before midnight......   
  
 
9.25.2006
cabin bulkhead install
Subscribe to:
Post Comments (Atom)

 
 
 Posts
Posts
 
 


0 comments:
Post a Comment