So here's some prep work on the mast bulkhead. This bulkhead is bomber. since I've decided to go with swing up boards, this bulkhead calls out for a total of ten layers of13oz. Uni directional glass between the passageway opening and the side of the "center" board box . The final bulkhead also has reinforcements around the top and bottom of the opening as well.
9.01.2006
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment